Table of Contents
    Add a header to begin generating the table of contents

    Recent Posts

    Anybox Boxmaker FAQs

    The equipment has different configurations, you can even add some optional function in our BM2508, Please contact us for a detailed quotation.

    Service will be online, we have a full set of manuals, instructions, and guide videos for installation. During Covid, we have guided many customers to get the machine done by themselves. This machine is not complicated, easy to install and put into production within one day. There is also online training for your operators.

    Yes, We have English speaking engineer team, who will be 24 hours online service.

    The normal delivery time is 20 days from deposit, if it is a legal holiday, it will be postponed accordingly.

    We offer one year of warranty from the date of installation.

    Request A Free Quote

      How-Corrugated-Cardboard-is-Produced-A-Look-into-Manufacturing-and-the-Role-of-Liner-vs-Medium

      Cost Estimation and Pricing Guide for Corrugated Boxes

      0
      (0)

      Corrugated Box Pricing Formula

      Box price (RMB) = Corrugated board price per m² (RMB/m²) × Box expanded area (m²).

      Calculating Corrugated Board Price per m²

      1.1 Standardize Measurement Units

      – Raw material pricing: Purchased facing paper, liner paper, core paper, and corrugated medium are priced per ton (RMB/ton). Convert to RMB/kg (e.g., 5000 RMB/ton = 5 RMB/kg).

      – Grammage: Convert paper weight from g/m² to kg/m² (e.g., 500 g/m² = 0.5 kg/m²).

      – Corrugation compression ratios:

      – A-flute: 1.59 (1.59m of medium → 1m after corrugation)

      – B-flute: 1.36

      – C-flute: 1.50

      – E-flute: 1.27

      1.2 Cost per m² for Each Layer

      – Facing/liner/core paper:

      Example: 350 g/m² facing paper at 5000 RMB/ton:

      `(5000/1000) × (350/1000) = 1.75 RMB/m²`

      – Corrugated medium:

      Example: 180 g/m² medium at 2000 RMB/ton (A-flute):

      `(2000/1000) × (180/1000) × 1.59 = 0.57 RMB/m²`

      1.3 Total Raw Material Cost per m²

      Example: 5-layer board (300 g/m² kraft facing, A/B-flute 180 g/m² medium, 180 g/m² core, 280 g/m² liner):

      Layer Grammage Price (RMB/ton) Calculation Cost (RMB/m²)
      Facing (kraft) 300 5200 (300/1000)×(5200/1000) 1.56
      Medium (A/B) 180 2250 (180/1000)×(2250/1000)×2.95 2.39
      Core 180 1700 (180/1000)×(1700/1000) 0.31
      Liner 280 2500 (280/1000)×(2500/1000) 0.7
      Total       4.96

      1.4 Factory Price of Corrugated Board

      – Factory price = Raw material cost / 0.65 (assuming 65% material cost share).

      Example: `4.96 / 0.65 = 7.63 RMB/m²`.

      Box Expanded Area Calculation

      2.1 Key Parameters

      – Machine width: Typically 1.6m (max 2.2m).

      – Box dimensions: Width (W), Height (H), Length (L) in meters.

      2.2 Formula

      Number of boxes per machine width (Y):  

      `Y = Machine width (X) / (W + H + 0.06)` (rounded down).

      1. Pricing width (B): `B = X / Y`.
      2. Pricing length (A): `A = (L + W + 0.06) × 2 + 0.04`.
      3. Box area (S): `S = B × A`.

      Notes:  

      – `0.06m`: Edge trimming allowance.

      – `0.04m`: Tongue allowance (non-reducible).

      How useful was this post?

      Click on a star to rate it!

      Average rating 0 / 5. Vote count: 0

      No votes so far! Be the first to rate this post.

      Related Posts

      Leave a Comment

      Your email address will not be published. Required fields are marked *